Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level […]
Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level […]
Recent Posts
- производитель инсинераторов
- Various Sorts Of Incinerators
- печь для сжигания домашних животных
- proveedores de incineradores
- Medical waste incineration system
- мобильный мусоросжигательный завод
- Medical Incinerator
- INCINERATEUR COMBUSTION DAMAGE OF MEDICAL WASTE PYROLYTIC As Well As LAB
- Отходы, которые можно сжигать или сжигать
- equipo crematorio para mascotas
- burner for medical waste
- установка для сжигания отходов в больницах
- Incinerator PLC
- incineradores 150 kg por hora
- burner providers

