Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level […]
Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level […]
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recording Operating temperature: Incinerator /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: continuous loading, Top Loading Capacity/Burn rate per hour: 250 -300 kg/hr Material: External- 3 layers Internal lining: a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock Secondary Combustion Chamber: Type: horizontal/vertical Temperature: 1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size […]
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recording Operating temperature: Incinerator /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: continuous loading, Top Loading Capacity/Burn rate per hour: 250 -300 kg/hr Material: External- 3 layers Internal lining: a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock Secondary Combustion Chamber: Type: horizontal/vertical Temperature: 1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size […]
Recent Posts
- Chambre de combustion clé de combustion diesel / GPL / GNL / incinérateur à combustion primaire
- Incinerator Delivery”
- ข้อดี 6 ประการของตัวกรองชัตเตอร์ลูกกลิ้งแบบท่ออากาศ
- Incinerador de residuos a diésel
- Pet crematorium as high as 200KG/day
- High Performance Small Incinerator Plant
- ВЫБРОС И СЖИГАНИЕ ТВЕРДЫХ ОТХОДОВ
- BRÛLEUR AVANCÉ À DÉCHETS MÉDICAUX
- Burning ability 50kg/hr with damp scrubber with dual released heater
- Incinerator Fuel Burner and User Guider”
- производители мусоросжигательных заводов Китай
- small scale medical incinerator
- Equipos Incinerador Animales
- déchets à risque sanitaire et incinérateur général de déchets
- Waste Incineration